Week 4
Tuesday, April 26th, 2005My wife e-mailed Mr. Anderson and inquired about how the permits and construction were coming along. He replied that the pool was in engineering and all paperwork was being collected. As soon as the construction packet was completed he could set up a tentative schedule.